Upper river – A91 road closure from 20-03-17 for ten days

The A91 will be shut for ten days at the old Fossoway Bridge for approximately ten days from the 20th March, to effect repairs to the bridge parapet which was damaged in a RTA. I expect access will be maintained to the hatchery and Fossoway Lodge so we should still be able to access the river by the bridge, regardless where the road is actually closed on either side.

Advertisements
This entry was posted in DAA News, River fishing. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s